Parks and Open Spaces

Narrabri

  • Vegetation control along streets.
  • Ovals and surrounds mowing.
  • Cemetery vegetation control.
  • Vegetation control in villages.
  • Public toilet repairs and maintenance.
  • Ovals and surrounds works.
  • Mowing and gardening at The Crossing Theatre.
Wee Waa
  • Mowing at cemetery.
  • Tree removals.
  • Watering of parks and sports fields.
  • New fence around irrigation tank at Dangar Park.
  • Weeding of roundabout and CBD gardens.
Pilliga
  • Hazard reduction mowing.
  • Cleaning of bore baths and toilets.
  • Removal of litter.
Gwabegar
  • Hazard reduction mowing.
  • Irrigation works at Anzac Park.
  • Removal of litter.
Boggabri
  • Mowing at cemetery.
  • Ovals and surrounds mowing.
  • Public toilet repairs and maintenance.
  • Mowing of recreational parks.
Airport
  • Aerodrome mowing.
  • Repairs and maintenance to bore.
Waste

A reminder that our transfer stations are for resident volumes of waste only. Our transfer stations do not accept commercial waste.

Please do not contaminate other stockpiles with general waste or throw rubbish directly onto the ground. Please dispose of household waste in the correct bin/area.

All commercial and business waste must be taken to the Narrabri Waste Management Facility or by arrangement with local waste disposal companies.

For more information about landfill and transfer stations visit Council's website

2026 Waste Calendar

The 2026 Waste Calendar is available from Council's website. Hard copies are also available for residents at Council's Administration Building.

Roads
  • Harparary Road upgrade is continuing.
  • Gravel Resheeting Program - Works continuing on MR329 Cypress Way.
  • Site preparation for rehabilitation of SR2 Berrigal Road.
  • Please see the roads maintenance update for the week commencing 2 February 2026.

Violet Street replacement project

Works to replace the Violet Street Bridge over Narrabri Creek are continuing.

Demolition work on the current bridge is underway. The old bridge deck will start to be removed this coming Thursday/Friday (5/6 February).

A detour is in place along Selina Street, Newell Highway and Tibbereena Street for the duration of works (please see below): 

Detour route.png

 

Works are expected to be completed by the end of September (depending on weather and other factors).

For more information, please visit the Violet Street Bridge replacement project page

Water/Sewer

  • Laidlaw Street, Boggabri water main renewal is continuing (pictured).
  • Bore investigation and water quality assessment Logans Lane and Saleyards test bores.
  • Water meter renewal program is continuing.
  • Bore pump test and water quality assessment at Saleyards test bore.
  • Narrabri Sewer pump station infiltration study implementation.
  • Sewer CCTV condition reporting and sewer jetting maintenance in Narrabri.
  • Millicent Drive sewer reconstruction.
Water-main-renewal-Boggabri.png
Tagged as: