Infrastructure update - week ending 26 October 2025

Published on 28 October 2025

Infrastructure-update-tile.jpg

Parks and Open Spaces

Narrabri

  • Mowing of sporting fields.
  • Rotary hoed soft fall at Cooma Oval and Pirate Park playgrounds.
  • Assisted with laying turf at the lawn cemetery.
  • Tree maintenance.
  • Mowing of oval surrounds.
  • Mowing of Cameron Park.
  • Mowing along Violet Street (from the roundabout to the bridge).

West teams

  • Mowing, slashing and snipping of open spaces.
  • Laying of new turf at the lawn cemetery.
  • Hedging along main street.
  • Snipping at the old cemetery.

Town team area

  • Hedging and gardening of town area.
  • Laying of new turf at lawn cemetery
  • Mowing and snipping at the old cemetery.

Wee Waa

  • Cleaning of public toilets daily.
  • Weekly emptying of park and town bins.
  • Mowing of sporting fields.
  • Mowing treatment works.
  • Mowing and snipping of Wee Waa Pool yard.
  • Mowing and watering of all parks.
  • Mowing of open spaces.
  • Daily cleaning of Wee Waa CBD.
  • Daily watering of CBD gardens.
  • Watering of sporting fields.

Pilliga

  • Cleaning of toilets twice a week.
  • Emptying of bins twice a week.
  • Playground inspection.

Pilliga Bore baths

  • Cleaning of bore baths once a week.
  • Emptying of bins twice per week.
  • Cleaning of toilets twice per week.
  • Mowing and snipping of bore yard.

Gwabegar

  • Emptying of bins once a week.
  • Mowing and snipping of Anzac Park.

Boggabri

  • Cleaning of town toilets daily.
  • Town bins and truck stop bins emptied twice weekly.
  • Spraying for weeds at cemetery, caravan park and parks.
  • Aerating of Jubilee Oval.
  • Watering of ovals, cemetery and parks.

Roads

  • Gravel resheeting works are continuing on Courada Road.
  • Stage 3 of Harparary Road upgrade is ongoing.
  • Tullamullen Bridge approach work is continuing - following inundation and wet weather. Demolition of old structure has been completed.
  • Flood Damage Heavy Patching Program is ongoing with crews working on Yarrie Lake Road and Old Pilliga Road.
  • Gravel production has started with dozer work at Greenhills Quarry.
  • Maintenance grading on SR42 McDowells Lane, SR84 Cliffdale Lane, SR58 Glen Idyll Road, SR38 Kiandool Lane, SR50 Stumpy Lane and SR33 Forest Way.
  • Please see the roads maintenance update for this week (27 October).
  • Violet Street Bridge tender has been assessed, with the report being compiled for the Extraordinary November Council meeting.
  • Greenhills Quarry extension approvals process is continuing. 

Water/Sewer

  • Mitchell Street, Wee Waa water main renewal has been completed.
  • Laidlaw Street, Boggabri water main renewal is underway.
  • Bore investigation and water quality assessment at Logans Lane and Saleyards test bores.
  • Bore pump test and water quality assessment at Saleyards test bores.
  • Pump replacement and augmentation of wiring infrastructure at Namoi Reservoir.
  • Elizabeth Street bore pump augmentation has been completed.
  • Chlorination servicing of all bore sites and Namoi Reservoir.
  • Sewer main access cover replacement along Narrabri Creek, Narrabri.
  • Narrabri Sewer Pump station infiltration study implementation.
  • Sewer service line repairs in Narrabri.
  • Sewer condition assessment and mains cleaning in West Narrabri.

Waste

  • Narrabri Waste Facility Expansion Development Application Public Notice is being advertised (see Council's website). 
  • The Mandalay Software (waste weigh-in software) upgrade is in progress.
  • GPS guided software has been purchased for the compactor and bulldozer, improving compaction rate consistency.
  • Mulching of green waste product at Boggabri Transfer Station has been completed.
  • JR Richards monthly contract meeting.
  • Litter control: The Team has been doing an excellent job keeping the site tidy during recent hot conditions and high winds.
  • IT and Building Services are working to restore WiFi onsite to allow visitors better communications.

Narrabri Airport

  • 4,746 litres of Jet A-1 were sold during the past week.
  • Cleaning of weather station equipment.
  • Weed spraying around Terminal, along carpark and roadway as well as around hangars.
  • Watering from bore around Terminal.
  • Mowing duties where required.

Facilities and Logistics

Facilities

  • Ongoing training at airport serviceability and re-fuelling.
  • Preparation for slab at Wee Wea Pool for bunded tank install.
  • Coordinated pest control sprays at the Wee Waa and Narrabri libraries.
  • Installed fencing at Narrabri Pool in preparation for bunded tanks to arrive.
  • Maintenance at Unit 1, Balonne Street.
  • Boggabri depot defects: Aircon service and inspection of water leak.
  • Boggabri Caravan Park: Cleaned gutters, installed gutter guard. Maintenance on TV antenna.

Logistics

  • Services carried out on light vehicles, grader, loader and excavator.
  • Air conditioning fixed on UD truck.
  • Front suspension replaced on ute.
  • Boggabri telehandler coolant leak fixed.
  • Liebherr dozer window replaced at Narrabri Tip.
  • Centre bearing replaced on drive shaft of tar truck
Tagged as: